Installation precautions for hard paperboard production line
Preparation before construction
1. Prepare factory construction drawings and grey paper hardboard production line drawings in advance to ensure the completeness and accuracy of the drawings;
2. Understand the on-site environment and terrain to provide reference for the installation of cardboard production lines;
3. Estimate construction time, prepare installation plan and determine material supply cycle to minimize installation time and production downtime as much as possible;
4. Choose a professional cardboard production line installation company to ensure installation quality.
Details during installation
1. First, carry out the construction of the foundation and building according to the requirements of the drawings, ensuring that the foundation of the building is firm and meets the requirements;
2. Install basic structures, conveying devices, paper machines, dryers, coilers, paper cutters, and other equipment according to the drawings;
3. Install electrical systems, including electrical wiring, device wiring and debugging, etc;
4. Install protective facilities, including safety fences, signal indicator lights, and entrance and exit warnings, to ensure the safety of employees;
5. During the installation process, carefully inspect all cardboard production line and pipelines.
If you are also interested in this machine,please don’t hesitate to contact us:
Overseas manager: Tom Wang
Email:cartonmachine.tomwang@aliyun.com
Phone/Wechat/Whatsapp:+86 13303078975
Post time: Apr-30-2024