Preparation work before operating the corner protector equipment

Before operating the paper board edge protector machine , you need to carry out a series of preparatory work to ensure the normal operation of the equipment and the safety of the operators. The following are the pre operation preparation steps based on the latest information:

1. Check the appearance of the equipment: Confirm that the outer shell and external components of the corner protector are intact, without damage or deformation.

2. Check power connection: Ensure that the power cord of the angle machine is securely connected and the power switch is turned off to prevent accidental start-up.

3. Check the condition of the cutting tools: Confirm whether the tools on the corner protector are sharp and replace them if necessary to ensure cutting effectiveness and safe operation.

4. Lubrication inspection: Check the lubrication system of the paper angle edge corner making machine to ensure sufficient lubricating oil for smooth operation of the equipment.

5. Safety inspection: Operators should wear appropriate personal protective equipment, such as safety helmets, protective goggles, etc., and ensure that all safety protection devices are in normal working condition.

www.wd-cartonmachine.com

6. Equipment inspection: Before starting up, check whether all components of the corner protector are in normal working condition, including the measuring mechanism, cutting mechanism, belt drive, and electrical control system.

7. Environmental preparation: Clean the operating area to ensure that there are no debris interfering with the normal operation of the equipment, and maintain a clean working environment.

8. Emergency stop function check: Confirm that the emergency stop button or switch is functioning properly, so that the power can be quickly cut off in emergency situations.

9. Familiar with the operation manual: Operators should have a detailed understanding of the operation manual and safety regulations of the paper corner protector production line to ensure correct operation of the equipment.

10. Trial operation: Before starting the formal operation, conduct a no-load trial operation to check whether the response and operation of the equipment meet the requirements.

The above steps combine the latest operating procedures and safety guidelines to help prevent accidents, ensure the safety of operators, and ensure the efficient operation of equipment.

www.wd-cartonmachine.com www.wd-cartonmachine.com www.wd-cartonmachine.com

 

exhibition

www.wd-cartonmachine.com

If you are also interested in this machine,please don’t hesitate to contact us:

Overseas manager: Tom Wang

Email:cartonmachine.tomwang@aliyun.com

Phone/Wechat/Whatsapp:+86 13303078975


Post time: Sep-26-2024