Welcome to our websites!

Safety operating procedures for partition assembler equipment

Safety operating procedures for full automatic partition assembler machine

1. The high-speed partition assembler machine must be operated by professionally trained employees and in accordance with operating procedures.

2. Ensure good lubrication of all mechanical moving parts.

3. All fasteners must be reliably connected.

4. No flammable or explosive materials shall be placed to prevent dust, corrosive gases, or liquids.

www.wd-cartonmachine.com

5. The compressed air of the high-speed automatic carton partition assembler machine must pass through a clean system before pneumatic control or execution components can be carried out, otherwise it will damage the machine components.

6. The compressed air of the 6-speed partition assembler inster machine first enters the air storage tank, main pipe filter, air dryer, machine air source regulation device, pneumatic control or actuator.

7. Before the high-speed automatic partition assembler insert machine is tested, it is necessary to carefully inspect the debris on the machine, check whether all electrical components are loose during transportation, especially the wiring screws. If there is any looseness, it must be firmly fastened.

www.wd-cartonmachine.com

https://www.wd-cartonmachine.com/automatic-partition-assembling-inserting-machinery-product/

www.wd-cartonmachine.com

customers

www.wdcartonmachine.com www.wdcartonmachine.com

If you are also interested in this machine,please don’t hesitate to contact us:

Overseas manager: Tom Wang

Email:cartonmachine.tomwang@aliyun.com

Phone/Wechat/Whatsapp:+86 13303078975


Post time: Nov-28-2023