Welcome to our websites!

The installation requirements for the grey cardboard production line

The installation requirements for the grey hardboard production line are as follows:

Equipment selection and matching

Equipment selection: Select suitable equipment based on production needs and product specifications, such as paper carriers, overhead conveyors, preheating machines, automatic edge alignment machines, glue coating machines, compaction machines, double-sided dryers, calenders, cooling and shaping machines, paper separators, cross cutting machines, stacking machines, etc.

Equipment matching: Ensure that the production capacity and technical parameters of each device match each other to ensure the overall coordination and efficient operation of the production line.

Installation environment requirements

Site requirements: The automatic 4 ply grey board production line should be installed on a flat and solid ground to ensure that the equipment will not shake or move due to uneven ground after installation.

Space requirements: Based on the scale of the production line and equipment layout, plan the space of the installation site reasonably, ensure sufficient spacing between equipment, and facilitate operation, maintenance, and overhaul.

Environmental conditions: The installation environment should be kept dry and well ventilated, avoiding the influence of moisture, corrosive gases, etc. on the equipment.

www.wd-cartonmachine.com

Equipment installation requirements

Basic installation: Construct the foundation according to the basic drawings provided by the equipment manufacturer, ensuring that the size, strength, and accuracy of the foundation meet the requirements.

Equipment installation: Install and debug the equipment according to the installation instructions, ensuring that the installation position, levelness, verticality, etc. of the equipment meet the requirements.

Pipeline installation: According to the process flow of the automatic paper hardboard production line, arrange and install various pipelines reasonably, such as steam pipelines, glue pipelines, cooling water pipelines, etc., to ensure that the pipeline connections are firm, well sealed, and there are no leaks.

Electrical installation: Install and wire electrical equipment according to the design drawings of the electrical system to ensure the safety and reliability of the electrical system.

hardboard-production-line-2

www.wd-cartonmachine.com www.wd-cartonmachine.com

www.wd-cartonmachine.com

If you are also interested in this machine,please don’t hesitate to contact us:

Overseas manager: Tom Wang

Email:cartonmachine.tomwang@aliyun.com

Phone/Wechat/Whatsapp:+86 13303078975


Post time: Apr-25-2025